Tank Demolition

 

C.S.T undertook a new challenge in 2011 which we demolished a tank that was 6 meter in diameter and  5 meters  tall. C.S.T can proudly say that we successfully completed Cold Cutting the tank in

1 ,5 meter sections with 2 technicians in 4 days.

Advantages of Using C.S.T for Cold Cutting Over Flame Cutting

 

•    Safety

•    No Spark

•    No Flame

•    No Air Born Contamination

•    No Chance Of Explosion

•    Cost Productive

6 Tanks

6 Tanks

Tanks To Be Demolished

Tank

Tank

6m In Diameter x 5m In Height

Cold Cutting

Cold Cutting

1.5m Sections Being Cut For The Waste Bin

CST29

CST29

Demolishing The Tank

Tank On Day 4

Tank On Day 4

The Last Peace Of The Tank Being Cold Cut

End Product

End Product

The Entire Tank In Waste Bins Ready For Removal

Contact us

Contact us for a quote.

Existing Clients

ThyssenKrupp

 

V.G.I Consulting

 

Sasol Technology

 

Sasol Shared Services

 

Sasol Gas

 

Sasol Polymers

 

Sasol Synfuels

 

Wetback

 

Chevron 

 

Sasol (Mozambique)

 

Songas (Tanzania)

Rand Water

 

Grinaker - LTA

 

Southern Pipelines

 

Sasol Oils (Secunda)

 

Sasol Sasolburg

 

Megchem

 

TransFab

 

PFG Glass

 

Linde AG 

 

MC Steelworks

 

Ultraspring (Nigeria)

 

Exon Mobil (Nigeria)

 

All major Oil Companies in Nigeria

  • w-facebook
  • Twitter Clean
  • google+

​© Copyright 2023 Moving Co. Proudly created with Wix.com